Shah Gas Development Project

Client:
GASCO
Location:
Abu Dhabi
Year:
2011
Type of Services:

TRE Role: Engineering Sub-contractor

Description:

Development of four wellpad systems each consisting of 1 satellite pad and 1 main pad with 20 wells. 16” Interpad pipelines and 24” transfer lines  with CRA (Inconel 625)  materials Generation of alignment sheets from Satellite images & Upheaval buckling calculations by K. Peter’s method