Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Qarn Alam Phase 3 Power Station Project | TR Engineering Consultancy LLC

Qarn Alam Phase 3 Power Station Project

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).
Client:
Petroleum Development Oman
Location:
Sultanate of Oman
Year:
2012
Type of Services:

TRE Role: Engineering Sub-contractor

Description:

The project scope included detail engineering services for installation of one Frame 9E Gas Turbine Generator (GTG) package (126MW ISO rating) and one Heat Recovery Steam Generation (HRSG) package with associated utilities for PDO in Qarn Alam.