Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Booster Compressor Project | TR Engineering Consultancy LLC

Booster Compressor Project

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).
Client:
Margham Dubai Establishment
Location:
Abu Dhabi
Year:
2007
Type of Services:

TRE Role: FEED & DD Engineering 

Description:

Margham Dubai Establishment is operating the Margham Field and Plant, located approximately 55 km from Dubai, off the Dubai - Hatta road. The gas produced from the Margham field is processed in the plant to dry the gas and recover stabilized condensate as export products. The overhead gas from the condensate stabilizer is dehydrated prior to export. The dry gas, dehydrated rich gas and the stabilized condensate are exported to consumers in the Jebel Ali area via dedicated pipelines. The excess dry gas is re-injected into the reservoirs. Scope of work to implement the Booster Compressor Project with, Two new Booster Compressor trains including Suction Scrubbers, Aftercoolers, UCPs (Unit Compressor panels); etc per train.