48” Gas Export Pipeline from Saih Rawl TO BVS-09

Client:
Petroleum Development Oman
Location:
Sultanate of Oman
Year:
2004
Type of Services:

TRE Role: Detail Design

Description:

Complete project FED verification, detail engineering and technical procurement support to main EPC contractor Punj Lloyd for execution of new 48" supply pipeline for expanding the transportation capacity of the existing 48" pipeline from Saih Rawl to Sur. The total pipeline network shall be an integrated pipeline system comprising of a proposed (new) 260 Kms 48" pipeline (from Saih Nihayda to BVS-09A), the existing 48" Pipeline (running from Saih Rawl to OLNG plant at Sur) and the interconnecting pipeline network between these two lines.