Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Zauliyah Gas Compression Project – Phase III | TR Engineering Consultancy LLC

Zauliyah Gas Compression Project – Phase III

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).
Client:
Petroleum Development Oman
Location:
Sultanate of Oman
Year:
2013
Type of Services:

TRE Role: Engineering Sub-contractor

Description:

The project scope included detail engineering services for revamping and debottlenecking of existing Zauliyah Production Station of PDO by installing new gas lift compressors, Gas conditioning unit consisting of Gas dehydration, gas dew point control by cooling with refrigerant, NGL stabilization, booster compressors and associated utilities.