Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Instrumentation Engineering | TR Engineering Consultancy LLC

Instrumentation Engineering

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).

Instrumentation Engineering

Design and engineering services for Fieldbus Control Systems, Distributed Control Systems, Programmable Logic Controllers, TUV approved Safeguarding Systems, Fire & Gas Systems, SCADA systems, Local Control Panels, Tank Gauging Systems, Metering Systems, HIPPS for over pressure protection, Field Devices including valves etc.

  • Specification and design development with Main Automation Contractor (MAC) for all systems or individual system vendors.
  • Preparation of philosophies for control and safeguarding
  • Preparation of System architecture diagrams and i/o lists
  • Preparation of cause & effect charts and functional logic diagrams
  • Sizing of flow elements and control valves
  • Preparation of Specifications and Data Sheets
  • Preparation of Cabling block diagrams, schedule, layouts and termination details
  • Preparation of Instrument layouts and installation details
  • Carry out SIL classification and implementation
  • Carry out Alarm rationalization and implementation
  • Participate in FAT, SIT and SAT
  • Provide Construction supervision and Commissioning assistance