Deprecated: Array and string offset access syntax with curly braces is deprecated in /home1/trengineering/public_html/misc/typo3/phar-stream-wrapper/src/PharStreamWrapper.php on line 445
Saudi ARAMCO Projects to TR for the Fadhili Gas Plant | TR Engineering Consultancy LLC

Saudi ARAMCO Projects to TR for the Fadhili Gas Plant

×

Error message

  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 302 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 303 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 311 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in include_once() (line 318 of /home1/trengineering/public_html/sites/default/settings.php).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 819 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: ini_set(): Headers already sent. You cannot change the session module's ini settings at this time in drupal_settings_initialize() (line 828 of /home1/trengineering/public_html/includes/bootstrap.inc).
  • Warning: session_name(): Cannot change session name when headers already sent in drupal_settings_initialize() (line 831 of /home1/trengineering/public_html/includes/bootstrap.inc).

Saudi ARAMCO awarded Tecnicas Reunidas (TR) the execution of two turnkey contracts for the Fadhili Gas Plant. TR will be responsible for all detailed engineering, the procurement and supply of equipment and materials, the construction of the plants and the assistance during the commissioning.

Fadhili Gas plant of ARAMCO will process 2500 MMSCFD of non associated gas from Hasbah and Khursaniyah fields. TR scope covers EPC of Package 1 Fadhili Gas Inlet & Treatment Facilities and Package 02 – Fadhili Process Utilities & Interconnecting Systems. The Fadhili Gas Plant (FGP) will consist of five processing trains. Four of these trains will process Hasbah offshore gas, consisting of inlet gas handling, gas sweetening, dehydration, and one train will process Khursaniyah onshore gas, consisting of inlet gas handling, and gas sweetening to produce fuel for the cogeneration facilities.

TR Engineering LLC, Oman is providing engineering support to TR Madrid.